Preparing for an ISO 45001 Surveillance Audit: Where to Start
A focused approach when preparation time is limited.
When a surveillance audit is approaching, it is tempting to update every document with an old review date. Start with the certification body’s audit plan and your own evidence of what has changed since the previous visit. Together, they show where to spend your preparation time.
The certification body sets the scope and sampling for each visit within its audit programme. The sequence below helps you prepare a few evidence trails that demonstrate how your system has operated since the last audit.
1. Revisit previous findings and significant changes
Take the previous report and identify findings that need follow-up. For each nonconformity, locate the response, investigation and evidence that the action worked. Where a result is pending, make sure the owner can explain the status and the planned verification.
Then list significant changes since the last visit. A new warehouse, a different shift pattern or a change in contractors may affect who owns controls and how well they work. Pick the changes most relevant to the audit plan and your current risks.
2. Walk through one critical operational control
Select a significant activity in scope. For example, if contractor maintenance is included, follow a recent job from hazard assessment and permit through handover and completion. Ask the people involved to explain what they did. Check how the process works on another shift or under different conditions where relevant.
If the walkthrough reveals a serious gap, address the exposure and record what you found. The useful audit evidence is the organisation’s response and follow-up.
3. Link your own checks to management decisions
Have the relevant internal audit results, compliance evaluations, OH&S performance evidence and management review outputs easy to find. Pick one example that connects them. An internal audit may have identified unreliable supervision on night shifts, followed by a management decision to change coverage and a later check that the new arrangement works.
For the opening meeting, confirm who can speak to each part of the evidence trail. Include workers and their representatives as appropriate, and make space for them to describe work in their own words.
If you only have one day
Use the first part of the day to confirm the audit plan and review prior findings and recent changes. Walk one high-risk activity while it is running. Finish by assigning any actions identified, checking evidence is accessible, and confirming availability with the people who know the work. That gives you a clear view of what you can demonstrate and where follow-up is still needed.
Related ISO 45001 clauses · 9.1 Monitoring, measurement, analysis and performance evaluation · 9.2 Internal audit · 9.3 Management review · 10.2 Corrective action
Further reading · NQA — ISO 45001 certification and surveillance
